MITRE Defense Agile Acquisition Guide - Mar 2014external systems. As with CM on traditional programs, there needs to be rigor on managing changes to baselines, designs, engineering, and program documentation. Some additional CM methods for Agile include: place to ensure rigorous configuration management of requirements, code, technical designs, and baselines? What is the continuous improvement strategy? See also: Agile architecture articles 10 meets the design-to or build-to specifications defined in the functional, allocated, and product baselines. In an Agile environment verification is an integral element of each sprint. At the end of each0 码力 | 74 页 | 3.57 MB | 5 月前3
Facebook -- TVM AWS Meetup Talksampling model running in 30us on single server CPU core - Beat hand-written, highly optimized baselines (https://github.com/mozilla/LPCNet) by ~40% - Bonus: Real-time on mobile CPUs for free 6 TVM0 码力 | 11 页 | 3.08 MB | 5 月前3
共 2 条
- 1













